Differences

This shows you the differences between two versions of the page.

Link to this comparison view

online:eventmodelmerge [2009/05/26 13:05] (current)
Line 1: Line 1:
 +====== Combine Low-level Activities ======
 +
 +When discovering a process model from an event log that includes "​start"​ and "​complete"​ events, the resulting model includes separate tasks referring to the beginning and completion of an activity. ​
 +
 +When a simulation model is to be generated from a mined model, it is desirable to have only one task in the model per activity (since "​schedule",​ "​start"​ and "​end"​ transitions will be generated in the CPN model itself based on the given configuration). This plug-in gets rid of these low-level ("​start"​ and "​event"​) activities by combining them, which can be seen as a rather technical step (default settings can be typically used).
 +